`


THERE IS NO GOD EXCEPT ALLAH
read:
MALAYSIA Tanah Tumpah Darahku

LOVE MALAYSIA!!!


 

10 APRIL 2024

Thursday, December 2, 2021

Cost of ECRL to stay at RM50bil, says Wee

 

ECRL construction work being done near Pasir Puteh in Kelantan. The alignment in the Selangor section of the project has now been confirmed. (Bernama pic)

KUALA LUMPUR: The construction cost of the East Coast Rail Link (ECRL) project will remain at RM50.27 billion, even after the Selangor government approved the proposed ECRL North Line Section C, said transport minister Wee Ka Siong.

He said the Selangor government’s decision would finalise the construction of the 665km ECRL line which includes 59 tunnels with a total length of 61km as well as several flyovers with a total length of 127km.

“The estimated cost of RM50.27 billion takes into account the construction work on the 16.39km Genting twin tunnel using two state-of-the-art tunnel boring machines (TBM) and the 14.10km Serendah Tunnel through blasting and drilling methods.

“The cost of the ECRL will also include the rolling stock of the ECRL when it operates later, consisting of electric multiple unit (EMU) sets for passengers and locomotives as well as wagons for cargo services,” he told reporters after the ECRL Section C (North Line) document presentation ceremony here, today.

Ads by Kiosked

In his speech earlier, Wee said the ECRL North Line would include the Serendah Bypass which is needed for Keretapi Tanah Melayu Bhd’s (KTMB) rail services to link with the ECRL project scope.

“The Serendah Bypass will serve as an important freight relief line for KTMB’s cargo rail services as it would bypass the busy Kuala Lumpur city centre,” he said.

He added that the Serendah Bypass was also expected to increase cargo volume for the ECRL by accommodating cargo from the East Coast states and existing KTMB routes.

“The decision to go ahead with the original alignment will make ECRL a viable infrastructure in line with a revenue ratio of 70% cargo services and 30% passenger services.

“On this factor, the ECRL alignment will include a dual gauge track of about 30km from the Jalan Kastam ECRL station to the Northport and Westport areas,” he said.

Wee said the construction of the ECRL was also expected to further drive the growth of the construction and building materials sector as well as support the recruitment of local manpower for construction-related activities. - FMT

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.